Facility for drilling waste treatment at NGK Slavneft performs effectively
Section: NewsPyrolysis plants of high efficiency TDP-2 has been manufactured and shipped to OAO NGK Slavneft field. TDP-2 was designed as drilling waste treatment equipment by the order of the oil company. It was commissioned on Kuyumbinskoye field this spring 2016.
The facility is now operating effectively and has been processed several thousand tons of drill cuttings. After the process is stabilized the valuable products such as dry subsoil, process water is yielded as well as heat, which can be used for the preparation of drilling fluids.