Request a call

Your name

Phone

The best time for a call?

TDP-2-2000 plant of high capacity put into operation at Kuyumbinskoye oil-gas field

Section: News

Drill cuttings treatment system TDP-2-2000

Service Company BT-Promotkhody successfully prolonged its contractual obligations with JSC NGK Slavneft for 2017.

The modernized model TDP-2-2000 was put into operation at Kuyumbinskoye oilfield aside from the two already operating TDP-2-800 units. The new plant features high capacity of 2000 kg per hour though it retains the dimensions of the former units. TDP-2-2000 is equipped with the retrofitted screw system enables to distribute the feedstock more homogenously. As a result, it leads to doubling of productivity of the equipment.

TDP-2-2000 is designed for utilization of drilling waste generated at NGK Slavneft oilfields. At present, the equipment is commissioned and its capacity of tens of tons per day fully complies with its specifications.

Let us recall, that the new model of IPEC manufacture, TDP-2-2000, is about to be shipped soon. The customer is large enterprise in Europe. Both TDP-2-2000 units are certified by TUV Nord and conforms European Directives.